Rough-ins

Where expert plumbing meets exceptional customer service.

Rough-ins

In plumbing, a rough-in refers to the initial stage of plumbing installation where the basic framework of the plumbing system is installed before walls, floors, or finishes are completed. Rough-ins include the installation of pipes, drains, and venting systems that will eventually connect to fixtures like sinks, toilets, showers, and bathtubs. These are typically done in new construction or major remodels.

Components of a Rough-In:

  • Water Supply Lines: Pipes that will deliver water to fixtures.
  • Drainage Pipes: Pipes that carry waste and wastewater away from fixtures to the sewer or septic system.
  • Vent Pipes: Pipes that allow air into the drainage system to prevent pressure buildup and keep the system functioning properly.
  • Waste Lines: Large pipes that handle waste and wastewater from toilets, showers, bathtubs, and sinks.
  • Fixture Placement: Ensuring the pipes are in place for future connection to sinks, toilets, and other fixtures. The plumber will mark or measure where the fixture connections need to be.

Typical Process of Rough-In Plumbing:

  • Planning: The plumber reviews the blueprints and designs the layout of pipes, drains, and vents. They will also determine the best places for each fixture.
  • Installation of Pipes: The plumber installs the necessary pipes for water supply, drainage, and venting. This step involves cutting and fitting pipes together.
  • Test and Inspection: The plumber will often pressure-test the water supply lines and check the drainage system to ensure everything is installed properly and there are no leaks.
  • Framing and Protecting: Once the rough-in is completed, the pipes are usually secured in place and may be covered temporarily by framing or drywall, but they won’t be sealed until the final finishing stages.

When is Rough-In Plumbing Done?

  • New Construction: Rough-in plumbing is done early in the construction process, usually after the foundation and framing are in place but before drywall or flooring is installed.
  • Remodeling: If you’re adding new plumbing fixtures or renovating a space, rough-in work might involve rerouting or adding new lines for water and waste.

Final Steps After Rough-In:

  • After the rough-in plumbing is complete and passes inspection, the next steps will be the finish phase, where fixtures like sinks, faucets, toilets, and bathtubs are installed, and the system is fully connected and tested.
Book an Appointment

Fast, reliable plumbing exactly when you need.

Schedule your appointment today for fast, reliable, and professional plumbing solutions tailored to your needs.
Free Consultations

+1 289-668-0212